5 FRIAR GATE, DERBY A period property undergoing extensive refurbishment to provide a restaurant and bar over 3 floors. Appointed to compile a building reinstatement valuation for insurance purposes. A detailed survey was undertaken to schedule the listed and period parts of the property to enable a detail assessment to be made.

Building Survey Case Study by Arc Building Consultancy Ltd BUSINESS ACQUISITION

Business Aquisition

BUSINESS ACQUISITION A financial company was looking to acquire a smaller High Street business comprising 12 properties based around Manchester, Birmingham and London. We inspected all properties and provided advice on the lease arrangements, current condition and ongoing liability so that liabilities could be fully assessed.

Building Survey Case Study by Arc Building Consultancy Ltd Picture Works Nottingham

The Pictureworks, Nottingham

5 year old residential development beside Nottingham train station. A Pension fund was looking to acquire the freehold from receivers as an income stream to supplement their spread of assets. Significant defects were noted due to the property not being fully completed prior to the developer going into receivership. Problems included poor balcony fixings, loose…

Unit 4, Blenheim Industrial Estate, Nottingham

UNIT 4G, BLENHEIM INDUSTRIAL ESTATE, NOTTINGHAM Investment acquisition of small industrial unit, fitted out by the tenant to provide extensive office and small warehouse accommodation. Built circa 2005, of steel frame portal frame construction with plasticised cladding with internal lining panel. Provided a pre acquisition survey and report and building reinstatement valuation.

Unit 23 & 24 Mannerside Industrial Estate, Redditch

UNIT 23 AND 24, MANNERSIDE INDUSTRIAL ESTATE, REDDITCH Acquisition for owner occupation and comprises two units connected into one provided extensive office and warehouse accommodation. Steel frame construction with a flat roof with interim steel columns encased in concrete with steel cladding and felted flat roof, constructed circa 1970/80. Provided a pre acquisition survey and…

Building Survey Case Study by Arc Building Consultancy Ltd Unit 4 Alcester

Unit 3, Alcester

UNIT 3, ALCESTER Investment acquisition of an office and warehouse/industrial building. A two and three storey  insitu concrete office building with a steel portal frame industrial unit. Currently let and fully occupied. Provided pre acquisition advice and report and organised and managed concrete testing.

Pegasus House, Peterborough

PEGASUS HSE, PETERBOROUGH A modern office development under single occupancy with circa 100,000 sq ft of net lettable office accommodation. Appointed by a prospective purchaser acquiring the investment freehold to prepare a building survey report which included a report on condition, building reinstatement valuation and repair costs. Acquisition value circa £11,000,000