Building Survey Case Study by Arc Building Consultancy Ltd REPAVING THE MALL WITHIN EXCHANGE ARCADE

REPAVING THE MALL WITHIN EXCHANGE ARCADE

Existing York stone paving had already been turned and a phased approach was required to ensure the retail areas could remain open.

Involved close liaison and negotiation with the planners, listed building officer and English Heritage with stone samples taken to identify the original quarry to source a similar stone.

Project completed 2014.