City Buildings, Carrington Street, Nottingham

Undertaking a Pre-acquisition report on one of Nottingham’s most iconic 19th Century buildings, on behalf of purchasers. The building extends to approximately 5,000 m2 (54,000 sq. ft) and our detailed report commented not only on structure, fabric and condition but provided advice in relation to external repairs and the works proposed in adapting and modernising…

Ground Floor, 35 Leicester Road, Anstey

Acting on behalf of a local business who required advice in relation to a potential relocation we have assisted by providing a Pre-acquisition report & costing advice in relation to proposed alterations, dilapidations advice on their existing property as well as providing support in negotiating a new letting. Client confidential

One Thorsbey Street, Nottingham

The last remaining original Boots factory building, located in the heart of Nottingham’s Creative Quarter, One Thorsbey Street is now occupied by a Not-for-profit organisation providing studio spaces, project space and art production facilities for its members and clients. We were instructed to undertake a Pre-acquisition Survey on behalf of the occupier.

Building Survey Case Study by Arc Building Consultancy Ltd

Middlemarch Office Park Coventry

MIDDLEMARCH OFFICE PARK, COVENTRY Office Park comprising 9 buildings set within an established Office Park located to the south east of Coventry City Centre. 95,000 sq ft. Purpose built. Appointed by prospective purchaser acquiring the investment freehold to inspect and prepare a Building Survey Report which included a report on condition, anticipated capital repair costs…

Building Survey Case Study by Arc Building Consultancy Ltd BUSINESS ACQUISITION

Business Aquisition

BUSINESS ACQUISITION A financial company was looking to acquire a smaller High Street business comprising 12 properties based around Manchester, Birmingham and London. We inspected all properties and provided advice on the lease arrangements, current condition and ongoing liability so that liabilities could be fully assessed.

Building Survey Case Study by Arc Building Consultancy Ltd Picture Works Nottingham

The Pictureworks, Nottingham

5 year old residential development beside Nottingham train station. A Pension fund was looking to acquire the freehold from receivers as an income stream to supplement their spread of assets. Significant defects were noted due to the property not being fully completed prior to the developer going into receivership. Problems included poor balcony fixings, loose…

Pegasus House, Peterborough

PEGASUS HSE, PETERBOROUGH A modern office development under single occupancy with circa 100,000 sq ft of net lettable office accommodation. Appointed by a prospective purchaser acquiring the investment freehold to prepare a building survey report which included a report on condition, building reinstatement valuation and repair costs. Acquisition value circa £11,000,000

Building Survey Case Study by Arc Building Consultancy Ltd Unit 4 Alcester

Unit 3, Alcester

UNIT 3, ALCESTER Investment acquisition of an office and warehouse/industrial building. A two and three storey  insitu concrete office building with a steel portal frame industrial unit. Currently let and fully occupied. Provided pre acquisition advice and report and organised and managed concrete testing.